Thursday, November 17, 2016

No more loadsheeding in Nepal

In the present context Nepal have abolished  load-shedding with the help of  Nepal Electricity Authority (NEA) chair person.
With the help of him now capital city of the country and  around big city such as Bhaktapur, Lalitpur and around Kabhre district.
The NEA have more good performance this time which was never been before as the demand have raise high.

The changed have made peoples face bright .



But, How it was possible ???

NEA told hydro power station to work on full function so that they could produce a lot of energy.
Brought more energy from India to supply the demand .
Every power station are working in proper way.


NEA have requested local people not to use equipment which consume more energy such as water-pump, heater, iron, and other equipment.


Even the chairman of NEA have been blocked on his way. And the office of him was also locked by the  members of the office rooms . 

No comments:

Post a Comment